No. Ruas | 33.20.20.14 |
Nama Ruas | Pecangaan - Sowan Lor |
Panjang (km) | 3.529 |
Lebar (m) | 6 - 8 m |
Status | Jalan Kabupaten |
Fungsi |
No | No Jembatan | Nama Jembatan |
---|---|---|
1 | 33.20.020.14.01 | Ds. Troso |
2 | 33.20.020.14.02 | Ngeling 1 |
3 | 33.20.020.14.03 | Ngeling 2 |
4 | 33.20.020.14.04 | Ngeling 3 |
5 | 33.20.020.14.05 | Ngeling 4 |
Kondisi | 2023 | 2024 |
---|---|---|
Baik | 3.43 | 2.23 |
Sedang | 0.00 | 1.30 |
Rusak Ringan | 0.10 | 0.00 |
Rusak Berat | 0.00 | 0.00 |
STA | 100 | 200 | 300 | 400 | 500 | 600 | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | 1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | 2400 | 2500 | 2600 | 2700 | 2800 | 2900 | 3000 | 3100 | 3200 | 3300 | 3400 | 3500 | 3529 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 29 |
Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
Tipe Bahu (Kiri) | Tanah | Tanah | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
Tipe Bahu (Kanan) | Tanah | Tanah | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
Tipe Drainase (Kanan) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
Kondisi | Baik | Sedang | Baik | Sedang | Baik | Sedang | Baik | Baik | Baik | Baik | Baik | Sedang | Sedang | Sedang | Sedang | Baik | Baik | Sedang | Sedang | Sedang | Baik | Sedang | Sedang | Baik | Sedang | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik |
Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
---|